- Graphic display of Parametric Products Trees (BOM)-
linked to:
-Procurement & Inventory department
-Workstations &machines
-Standard times
-Transitions
-Employee
-Ext…
- Powerful generator-
Building Catalog Number with description according features and rules.
- Item card-
includes:
-Drawings image
-Photographs of each process
– PDM/PLM data
-E.C.O links to CRM complaints and more…
- Material Requirement Planning (MRP)-
According to:
-supply time of raw materials
-supplier’s orders, customer orders
-delivery dates
-loads.
- Supervision, Control and Management of Workstations:
-Setup & Run times
-Standard or normal times
-Workers
-Costs and link the financial system
-Percent of failures and types of defects
|
- Automatic reduction from inventory.
- Inventory Provision.
- Collecting processing time from the factory floor (Bar Code, PLC connectivity)
- Checking and changing manufacturing process according time of customers’ orders, delivery dates.
- Loads calculations:
Based on:
-Production instructions
-Machinery operations
-Delivery dates
-Customer value.
- Cancellation of production orders and returns of raw materials to the warehouse if needed.
- Reports & Alerts:
-General production reports.
-Failures and Bottlenecks reports.
-Employee/departments productivity reports.
-Production of manufacturing reports (comparison standard vs. in practice)
- Product Cost accounting
According:
-BOMs
-Corporate overhead allocations
-loads
-Inventory valuation
-workstations overhead
-Ext.
|